top of page
Search
  • Writer's pictureThe San Juan Daily Star

Aguirre Central unit breaks down, leaving 60,000 without power



Central Aguirre unit breaks down, leaving 60,000 without power

By The Star Staff


Some 60,000 electrical energy customers were without service over the weekend after a breakdown in unit 1 of Central Aguirre, according to Genera PR, the private operator of the island’s power generation fleet.


“Our technical staff is actively working to replenish [...] the protection units as soon as possible,” the company said late Saturday, noting that its operations team was working to identify the cause of the unit’s failure in order to put it back into service.

65 views2 comments

2 Kommentare


Rafael Mendez
Rafael Mendez
11. Juni

The entire power grid system is past it's

Prime.It needs a complete overhaul.

Gefällt mir

Rafael Mendez
Rafael Mendez
11. Juni

The entire power grid system is absolete. It needs a total "face" lift.


Gefällt mir
bottom of page