top of page

PR secures more than $32 million in FEMA funding for infrastructure, hospitals and power grid projects

Writer: The San Juan Daily Star
The San Juan Daily Star
2 hours ago
3 min read

By THE STAR STAFF


Gov. Jenniffer González Colón on Thursday announced the obligation of more than $32.2 million in federal funding from the Federal Emergency Management Agency (FEMA) for 22 recovery, reconstruction and mitigation projects across Puerto Rico, including improvements to hospitals, roads, community facilities and the island’s electrical system.


The allocations total $32.22 million and are tied to recovery efforts related to Hurricane Maria, the 2020 earthquakes and Tropical Storm Ernesto. According to the governor, the projects are aimed at strengthening critical infrastructure while advancing long-term resilience against future disasters.


Of the total funding announced, approximately $30.8 million is associated with 18 Hurricane Maria-related projects, $822,215 with two earthquake recovery projects, and $690,492 with two projects stemming from damage caused by Tropical Storm Ernesto.


“The damage caused by the various disasters Puerto Rico has faced requires solutions on multiple fronts, from the rehabilitation of roads and hospitals to the protection of our electrical facilities and community spaces,” González Colón said in a statement. “Each of these allocations allows us to address specific areas that directly affect the daily lives of our residents.”


The largest allocation, nearly $12 million, was awarded to the Department of Transportation and Public Works (DTOP) to complete reconstruction work at the Puerta de Tierra recreational promenade and plaza area in San Juan. The coastal infrastructure sustained significant damage during Hurricane Maria. The funding will cover restoration work, construction management, inspections and environmental compliance services.


Another major award, totaling more than $6 million, was directed to the Mennonite Health System for mitigation projects at the general hospitals in Aibonito and Caguas, as well as Hospital CIMA. The work includes strengthening roofs, doors and windows with impact-resistant components designed to reduce the facilities’ vulnerability during future storms.


The Puerto Rico Electric Power Authority (PREPA) received $2.93 million for mitigation efforts on transmission and distribution infrastructure within the utility’s Ponce Region 6 service area. The project will focus on vegetation management and removal of trees and brush that pose risks to power lines.


The Pontifical Catholic University of Puerto Rico was awarded $2.76 million for administrative and project management costs associated with eligible FEMA Public Assistance recovery projects linked to Hurricane Maria.


Meanwhile, the municipality of Maricao received $1.29 million for permanent repairs to a section of PR-425 in the Las Guabas sector. The project includes slope stabilization work, installation of gabion walls and safety barriers intended to reduce the risk of future failures along the roadway.


Several additional projects also received significant FEMA support. Among them are nearly $1 million for public lighting rehabilitation in the municipality of Moca and roughly $901,000 for repairs involving electrical conductors, insulators and utility poles. Another $711,397 was allocated to repair municipal facilities in Guayanilla that were damaged during the 2020 earthquake sequence.


Other approved projects include repairs and improvements to parks, sports facilities and community spaces in Utuado, San Lorenzo and Florida; mitigation and maintenance work on electrical infrastructure; repairs to facilities owned by the Church of God Pentecostal Movement International; and emergency protective measures at the Pontifical Catholic University following the earthquakes.


Under the Tropical Storm Ernesto disaster declaration, FEMA obligated $573,555 for slope repair work at a linear park in Barranquitas and an additional $116,937 for Public Assistance project administration costs in the municipality of San Germán.


Gabriella Boffelli, executive director of the Puerto Rico Federal Affairs Administration (PRFAA), said ongoing coordination with FEMA and federal officials remains essential to keeping reconstruction efforts moving forward.


“Through PRFAA, we maintain continuous communication with FEMA and the administration of President Donald Trump to monitor matters related to Puerto Rico’s recovery projects,” Boffelli said. “Our work in Washington helps keep communication channels open with federal agencies, address inquiries and ensure that issues requiring attention receive the appropriate follow-up.”


Puerto Rico continues to manage billions of dollars in federally funded recovery projects nearly a decade after Hurricane Maria devastated much of the island’s infrastructure in 2017. Federal recovery funds have supported rebuilding efforts in transportation, healthcare, energy, education and municipal facilities, while more recent disaster declarations have added new recovery and mitigation needs.

bottom of page